ERP to rise at three locations come 28 August 2023
ERP is set to rise at a total of three locations during four specified time periods come 28 August 2023.
The changes come following an observed traffic build up by the LTA at various stretches of expressways. To better manage this congestion, these stretches will see ERP rates increased by $1.00. A full list of the affected locations and time periods is reproduced in the table below:
Time period and location | Current ERP Rates |
ERP rates w.e.f 29 May 2023 |
|
PIE (Adam and Mount Pleasant) (Set of two Gantries) | |||
6:00am - 6:30am | $0.00 | $1.00 | |
KPE (ECP) after Defu Flyover | |||
8:30am - 9:00am | $5.00 | $6.00 | |
Westbound PIE before Eunos | |||
8:30am - 9:00am | $1.00 | $2.00 | |
9:00am - 9:30am | $0.00 | $1.00 |
ERP is set to rise at a total of three locations during four specified time periods come 28 August 2023.
The changes come following an observed traffic build up by the LTA at various stretches of expressways. To better manage this congestion, these stretches will see ERP rates increased by $1.00. A full list of the affected locations and time periods is reproduced in the table below:
Time period and location | Current ERP Rates |
ERP rates w.e.f 29 May 2023 |
|
PIE (Adam and Mount Pleasant) (Set of two Gantries) | |||
6:00am - 6:30am | $0.00 | $1.00 | |
KPE (ECP) after Defu Flyover | |||
8:30am - 9:00am | $5.00 | $6.00 | |
Westbound PIE before Eunos | |||
8:30am - 9:00am | $1.00 | $2.00 | |
9:00am - 9:30am | $0.00 | $1.00 |